BIL
|
TAJUK PROJEK
|
PELANGGAN / KONTRAKTOR UTAMA
|
KOS PEMBINAAN (RM)
|
TAHUN YANG SIAP
|
1
|
PAPAN TANDA DI UUM SINTOK, KEDAH DARUL AMAN.
|
UNIVERSITI UTARA MALAYSIA (UUM)
JORA KASTURI TRADING
|
44,000.00
|
2009
|
2
|
CADANGAN MENAIKTARAF JALAN DARI SIMPANG KUAH KE TAMAN SRI BERLIAN MUKIM KUAH, DAERAH LANGKAWI, KEDAH DARUL AMAN.
|
LADA
WIDAD BUILDERS SDN BHD
|
900,000.00
|
2009
|
3
|
MEMBINA BLOK BANGUNAN PEJABAT PELAJARAN DAERAH PADANG TERAP / PENDANG, PADANG TERAP, KEDAH DARUL AMAN.
|
KEMENTERIAN PELAJARAN MALAYSIA
JASA PEDOMAN SDN BHD
|
5,663,655.00
|
2011
|
4
|
CADANGAN MEMBINA SEBUAH BANGUNAN SATU TINGKAT RESTORAN MAKANAN SEGERA YANG MENGANDUNGI 1 UNIT RESTORAN KFC ‘DRIVE THRU’, 1 UNIT RESTORAN PIZZA HUT, 1 UNIT KEBUK SAMPAH DI LOT 36643, JALAN RAJA DR. NAZRIN SHAH, 31610 IPOH, PERAK DARUL RIDZUAN.
|
KFC (PENINSULAR MALAYSIA) SDN BHD
LOW THEON & SONS SDN BHD
|
5,900,000.00
|
2011
|
5
|
BAKI KERJA UNTUK CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH MASJID AL-HUSSAIN DI ATAS LOT PT 5392, KUALA PERLIS, PERLIS INDERA KAYANGAN.
|
Y.BHG.TAN SRI DATO HAJI M. ARIFFIN YUSUF
|
2,923,778.76
|
2011
|
6
|
CADANGAN PEMBANGUNAN PROJEK PENDIDIKAN BAGI SMK GUAR NANGKA (18BD) MUKIM SIDING
|
KEMENTERIAN PELAJARAN MALAYSIA
|
5,266,145.30
|
2012
|
7
|
CADANGAN PEMBANGUNAN 1 UNIT BANGUNAN 1 TINGKAT RESTORAN KFC DRIVE THRU DI ATAS LOT 1789, DAERAH HILIR PERAK, BANDAR TELUK INTAN, PERAK DARUL RIDZUAN.
|
BK MAJU CONSTRUCTION SDN BHD
|
3,252,172.60
|
2013
|
Projek-projek yang siap
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment